Photo by Greg HIllRunway 15-33 Rehabilitation and Extension

This project consists of constructing a 593-foot extension on the south end of Runway 15-33 (increasing the length to 6,281 feet) and rehabilitating the existing runway pavement. In addition, Woodlawn Drive will be realigned to be outside the limits of the new Runway Protection Zone (RPZ) on the south end of Runway 33 once it is extended to the south.

Runway 4-22 Rehabilitation

This project will include the rehabilitation, not the extension, of Runway 4-22, which is 7,192 feet long.